Building & Units
Block, floor and unit matrix; the work list and status of every unit and common area.
What is it for?
Building & Units sets up the project's physical skeleton. You create blocks, floors and units in bulk and add common areas such as garden, parking and facade as separate zones. For each unit and zone an automatic checklist is generated from a work item catalog (structure, plaster, mechanical, electrical, paint…). So the answer to "which work is finished in unit 302 on the 3rd floor of block A?" is in one place.
How does it work?
- 1With bulk unit creation you enter the block name, floor range and units per floor; the matrix is generated automatically.
- 2Common areas (parking, landscaping, facade, roof…) are added as zones.
- 3The work item catalog is applied to units and zones; depending on the unit's features (underfloor heating, smart home, shell-and-core handover, etc.) unnecessary work is automatically marked "not to be done".
- 4Clicking a unit opens its detail window: tabs for work items, defects, drawings, takeoff, contact info and the QR card.
Highlights
- Block/floor/unit grid; each cell shows progress percentage and an open-defect badge.
- Work item catalog by category and bulk subcontractor assignment ("all electrical work → X Electric").
- Automatic "not to be done" rules based on unit features, with the reason.
- A customer-facing QR card for every unit and zone.
As a developer (employer)
Sets up the building, applies the catalog, assigns work to subcontractors, tracks the status of all units.
As a subcontractor
Sees and ticks off only the work items assigned to it.
How it connects to other modules
Building is the foundation for many modules: defects, takeoff, drawings, work done, sales and QR cards are all tied to a unit or zone.