All modules

Platform

QR Cards

A live status card for units and zones that opens without login; customers, tradespeople and inspectors scan the QR.

What is it for?

A unique QR code and a public card address are generated for every unit and common area. Whoever scans the QR (customer, tradesperson, inspector) sees the card without logging in: work item progress, done and remaining work, "not to be done" items with reasons, open defects, current drawings, work records and takeoff. The card is shown in Turkish, English, Russian and Georgian; the company logo appears on it.

How does it work?

  1. 1The "QR" tab is opened in the unit or zone detail.
  2. 2The QR is downloaded as PNG, the link copied or printed directly.
  3. 3The QR is stuck on the door or the area.
  4. 4Whoever scans it sees the card; the language is changed with the KA/TR/EN/RU selector.

Highlights

  • No login required; read-only and hidden from search engines.
  • 4 languages (including Georgian).
  • The card runs on live data: it updates as work progresses.
  • Company logo and branding.

As a developer (employer)

Generates and prints QR codes; what the card shows is determined by the building data.

As a subcontractor

Knows its own work shows on the card; uses the card on site.

How it connects to other modules

QR Cards show data from Building (work items), the Defect List, Drawings, Work Done, Takeoff and Company Settings (logo) on one page.