Site Instructions
Every instruction, decision and event given verbally on site is recorded; nothing is forgotten, everything is tracked.
What is it for?
Most things on site happen verbally: "strip the 3rd floor column formwork tomorrow". The instruction log puts this verbal flow on record. Records can be of type instruction, decision, inspection, delivery, visit, work stoppage, meeting note and observation; who said it, to whom, where and by when is kept. A record moves through a status flow and can become a task or a defect when needed.
How does it work?
- 1A record is added: type, priority, what was said, who said it, to whom (worker/subcontractor), where (unit/zone), deadline and photo/voice recording.
- 2The other side marks it "received"; when the work is done it says "done"; the developer closes it with "verified".
- 3Inspection and observation records become defects in one click; instructions become tasks on the task board.
- 4With "Distribute defects" the selected defects are assigned to one worker or subcontractor at once; an instruction opens automatically for each defect.
Highlights
- Deadline tracking: overdue instructions are badged and shown on the Overview.
- Photo, voice recording and file attachments.
- A warning when assigning a worker with an expired document.
- When a drawing revision is published, an instruction opens automatically for the affected units.
As a developer (employer)
Gives instructions, verifies them, converts them to tasks/defects, distributes defects in bulk.
As a subcontractor
Receives instructions addressed to it and marks them done; can also open records for its own team.
How it connects to other modules
Instructions work with the Task Board (convert to task), the Defect List (convert to defect and distribute) and Drawings (revision instruction); overdue ones show up in the Overview and the payment penalty suggestion.