All modules

Site

Drawings & Revisions

Sheets by discipline, current revision first; a new revision alerts the site automatically.

What is it for?

Drawings stores architectural, structural, mechanical, electrical, landscape and infrastructure sheets with revision codes. Each sheet can be linked to a unit, a zone or the whole project. A file uploaded with the same name and discipline becomes that sheet's new revision; the current revision stands out and older ones stay in history. When a new revision is published, the site is informed — so nobody keeps working from the old sheet.

How does it work?

  1. 1A sheet is uploaded: name, discipline, revision code (R0, R1…), issue date, revision note, file (PDF/DWG/image).
  2. 2Uploading a new file with the same name and discipline automatically creates a new revision; the old one stays in history.
  3. 3On a new revision the work items in that unit are flagged "revision pending", an instruction is opened and an announcement is published.
  4. 4The site opens the current sheet from the unit's QR card or the Drawings tab.

Highlights

  • The current revision stands out, history in a dropdown.
  • Sheets linked to a unit, zone or the whole project.
  • Automatic chain on revision: work item flag, instruction, announcement, notification.
  • Search plus discipline/location filters.

As a developer (employer)

Uploads sheets, publishes revisions, sends automatic alerts to the site.

As a subcontractor

Views the current sheet; can delete sheets it uploaded itself.

How it connects to other modules

Drawings form a chain with Instructions, Announcements and Building: when a revision is published, the affected units are flagged and the site is informed.