Risk Register
Recording project risks with a 5×5 probability–impact matrix and a mitigation strategy.
What is it for?
The Risk Register records risks threatening the project (schedule, cost, quality, HSE, scope, external) with probability and impact scores. Score = probability × impact; a coloured 5×5 matrix shows the distribution of open risks. A risk is kept with a title, description, category, related subcontractor and mitigation strategy and moves through open → mitigated → closed. A delayed activity in the Schedule can be turned into a risk in one click.
How does it work?
- 1A risk is added: title, description, category, probability (1-5), impact (1-5), subcontractor, mitigation strategy.
- 2The matrix shows the count of open risks per cell by colour.
- 3Risk status moves open → mitigated → closed.
- 4"Add to risks" in the Schedule opens an automatic risk record for a delayed activity.
Highlights
- Classic 5×5 risk matrix.
- Score level: low / medium / high / critical.
- Automatic risk record from a delay.
- Reflected in the subcontractor scorecard.
As a developer (employer)
Records risks, runs the mitigation strategy, closes them.
As a subcontractor
This module is available to the developer only.
How it connects to other modules
The Risk Register is linked to the Schedule (delay → risk), Milestones, HSE and Scorecards.