All modules

Site

Health & Safety

Near miss, first aid, recordable accident: incident log, root cause and corrective action.

What is it for?

The HSE module records occupational safety incidents on site. You enter the incident type (near miss, first aid, recordable, lost time), severity, date/time, location, description, root cause and corrective action; the worker involved and the relevant subcontractor can be selected and evidence photos attached. An incident goes through open → under investigation → closed; incidents requiring OSHA reporting are flagged separately.

How does it work?

  1. 1An incident is reported: type, severity, location, description, root cause, corrective action.
  2. 2The relevant subcontractor and the worker involved are selected; photos/files are attached.
  3. 3Status moves from "open" to "under investigation" and then to "closed".
  4. 4Summary cards show open incidents, high/critical incidents and the number of OSHA-reportable cases.

Highlights

  • Incident type and severity classification.
  • Per-worker records: analysis of repeat incidents.
  • Reflected in the subcontractor scorecard and the Overview.
  • Photo evidence and file attachments.

As a developer (employer)

Opens, investigates and closes incidents; tracks them per subcontractor and worker.

As a subcontractor

This module is available to the developer only.

How it connects to other modules

HSE is linked to HR (workers), Scorecards (subcontractor score), the Risk Register and the Overview (health score).