Site
Site Log
The official record of the day: weather, headcount, equipment hours, work stoppage and notes.
What is it for?
The Site Log keeps the official site record for each day: weather, whether work was stopped, headcount, equipment hours used and free notes. Weather is suggested automatically from the project location; equipment hours are posted to the meters in the Equipment module. Keeping a log creates evidence for delay and force majeure claims.
How does it work?
- 1A new log entry is opened: date, weather (automatic from location), was work stopped, headcount.
- 2Equipment hours are entered (e.g. tower crane 7.5 hours); total operating hours are added to the equipment card.
- 3Notes and photos are added; without internet the entry waits on the phone.
- 4Log entries are listed by date; the Schedule weekly report and work-stoppage days are read from them.
Highlights
- Weather filled automatically from the location.
- Equipment operating hours go to the meter; service time is calculated.
- Work-stoppage days count as "excused days" in the defect penalty calculation.
- Offline entry support.
As a developer (employer)
Keeps the log, enters equipment hours, records work stoppages.
As a subcontractor
This module is available to the developer only.
How it connects to other modules
The log is linked to Equipment (hour meter), HR (headcount), the Schedule (weekly report) and the payment penalty suggestion (work-stoppage days).