All modules

Site

Documents

Project documents in one place: permits, specifications, contract attachments, photos.

What is it for?

Documents is the project's general file archive. A document is uploaded with a title, category (drawing, contract, permit, technical specification, photo, other) and file. The uploading company can delete it; both sides can see it. Files are kept in private storage and opened via signed links.

How does it work?

  1. 1A document is uploaded: title, category, file.
  2. 2The list is tagged by category; size and uploading company are shown.
  3. 3Clicking a document opens it in a new tab.
  4. 4The company that uploaded the document can delete it if needed.

Highlights

  • Category tags.
  • Private storage, access via signed links.
  • Both sides can see; only the uploader can delete.
  • Contract-specific files are in Contracts > Files.

As a developer (employer)

Uploads and archives project documents.

As a subcontractor

Uploads its own documents and sees shared ones.

How it connects to other modules

Documents is the general archive; drawings live in Drawings, contract files in Contracts and compliance documents in Compliance.