Requests for Information (RFI)
Ask design questions from site and keep the answer on record.
What is it for?
An RFI (Request for Information) is the site's written question about a design or specification ambiguity: "Why is this column section different in the drawing and in the structural design?". The question is opened with a subject, priority and attachment; the developer answers and closes it. It leaves a traceable record instead of verbal confusion.
How does it work?
- 1The subcontractor or developer opens an RFI: subject, question, priority, optional attachment.
- 2The RFI is listed as "open"; the priority badge and asking company are visible.
- 3The developer writes an answer; status becomes "answered".
- 4When the matter is settled the developer closes the RFI; the record stays in history.
Highlights
- Prioritised (urgent–low) questions.
- Questions with attachments.
- The number of open RFIs shows on the Overview and the project health card.
- If the answer has a cost impact, a Change Order is opened separately.
As a developer (employer)
Answers and closes; can also raise its own questions.
As a subcontractor
Opens RFIs and follows the answer.
How it connects to other modules
RFIs are used together with Drawings (ambiguity in a sheet), Change Orders (answers with cost impact) and Documents.