Site
Warehouse / Stock
Site warehouse: stock, automatic deduction and demand forecast.
What is it for?
The Warehouse module keeps the site's material stock and automates two things. First, deduction: if a Work Done record is linked to a recipe, the required material is deducted from the warehouse automatically (if stock is insufficient it is marked "partial" or "out of stock"). Second, forecast: shortages are found as remaining takeoff × recipe − in stock − on order, and turned into a purchase request in one click.
How does it work?
- 1A stock item is added: material (picked from the catalog), unit, quantity on hand, minimum level.
- 2Receipts/issues are entered manually; when stock runs low a "Low stock" badge appears.
- 3Work Done records automatically deduct the material from the linked recipe; the "Recent consumption" list shows them.
- 4The demand forecast table finds shortages from remaining work, stock, orders, 14-day consumption and days left; "create requests for shortages" sends them to Procurement.
Highlights
- Automatic stock deduction and reversal.
- Demand forecast: remaining work + consumption rate + quantity on order.
- Low-stock warning.
- Excel export and the Material Catalog (rename once, it changes everywhere).
As a developer (employer)
Manages stock, watches the forecast, raises requests for shortages.
As a subcontractor
This module is available to the developer only.
How it connects to other modules
Warehouse is linked to Takeoff (demand), Work Done (deductions), Procurement (requests and deliveries) and the Material Catalog.