Quality Inspection (ITP)

Inspections from templates, hold points, failed items become defects automatically.

What is it for?

The quality module records checks before and after work (ITP). An inspection is opened from a template (pre-pour concrete, plaster, tiling, electrical before closing come ready-made); each item is marked pass or fail. An item starting with "!" is a hold point: the next activity cannot start until it passes. When the inspection is closed, failed items drop into the Defect List automatically.

How does it work?

  1. 1Add the ready templates or write the company's own; each line is one item.
  2. 2Open an inspection: template, location (unit/zone), date.
  3. 3Mark items pass/fail and add notes and photos.
  4. 4On closing, failed items become defects; hold points with high severity.

Highlights

  • Ready ITP templates (concrete, plaster, tiling, electrical).
  • Hold point: no next activity until passed.
  • Failed item → automatic defect.
  • Inspection history by location and date.

As a developer (employer)

Manages templates, opens and closes inspections.

As a subcontractor

Sees inspections on its own work and closes defects.

How it connects to other modules

Quality links to the Defect List (automatic defects), Building & Units (location) and the Subcontractor Scorecard.