Topics
All topics

Platform

Mobile and offline work

Installing on a phone, the offline record queue, photo compression, dictation and the mobile layout.

Installing on the phone

  1. 1Open buildos.ge in the phone's browser and sign in.
  2. 2On Android choose "Add to home screen" or "Install app" from the menu; on iPhone use Share › "Add to Home Screen".
  3. 3Open it from the app icon; allow camera and location access.

Recording without internet

Work Done, Site Diary, Defects and the other marked forms write the record, with attachments, to the device's own database when there is no connection. An "Offline" and "N records waiting" indicator appears at the top.

When the connection returns the queue is sent automatically. A failing record is flagged; retry it with "Send now" or delete it. Lists opened earlier are read from cache while offline.

Photos

Photos uploaded from site are converted to WebP on the phone before sending and reduced to 1080p / under 500 KB; uploads are fast even on a weak connection.

Mobile layout

On a phone, dialogs open as sheets from the bottom and close with a swipe down. The save button always stays fixed at the bottom, and fields are large enough to tap with a finger. The microphone button in text fields turns speech into text.

Related module pages

Sign in with the demo account to try it

In the demo company every screen in this guide is filled with sample data; it is reset every night.

[email protected] · Demo12345!

Subcontractor account: [email protected] · Demo12345!

Independent subcontractor account (two employers): [email protected] · Demo12345!