Topics
All topics

Site

Workforce, attendance and the worker portal

Worker card, daily and bulk attendance, QR/GPS site check-in, leave, payroll and subcontractor workforce control.

Worker card

A worker is added with trade, daily wage, employment type and crew. The card holds a photo, personal and emergency details, documents and trainings; an expired document raises a warning, also when the worker is assigned to a job. Issued items (PPE, tools, keys) and their return are tracked on the same card.

Attendance

In the Daily tab attendance is entered one by one or in bulk by crew: hours, overtime, which job and where. Cost is calculated from the daily wage.

A worker can work on more than one site on the same day; a separate attendance row is kept for each site and one does not overwrite the other.

Site check-in with QR and GPS

  1. 1Enter the ID number on the worker card and click "Create PIN"; the PIN is shown only once.
  2. 2The worker signs in at /calisan on their phone with ID number + PIN.
  3. 3They scan the QR at the site entrance or tap "I'm here" with their location; if they are far from the site the record goes to review.
  4. 4At the end of the day they tap "I'm leaving"; the time is written to attendance as normal and overtime hours. If forgotten, it closes automatically at day end.

Leave and payroll

Leave requests come from the worker portal or are opened in HR and approved; paid annual leave is calculated. At month end payroll computes gross (attendance + leave), bonus, advance, deductions, net, paid and remaining, and exports to Excel.

Subcontractor workforce control

The developer sees the records subcontractors enter in their own attendance for a date range: by job (man-days per activity, average crew) and by company. A red warning appears when nobody is working on a delayed job.

Related module pages

Sign in with the demo account to try it

In the demo company every screen in this guide is filled with sample data; it is reset every night.

[email protected] · Demo12345!

Subcontractor account: [email protected] · Demo12345!

Independent subcontractor account (two employers): [email protected] · Demo12345!