Topics
Commercial
RS.ge waybills
RS.ge connection, search in incoming waybills, stock-in approval, internal waybills and new-waybill alerts.
Connection
In Company Settings › RS.ge connection enter the service user (user:TIN) and password you created on RS.ge (eservices.rs.ge). It is verified on RS.ge when saved; the password is stored encrypted and nobody can see it.
Incoming waybills and search
Procurement › RS.ge waybills › Incoming. Waybills of the chosen period (7/30/90 days) load in the background with their goods; they are fetched again from RS.ge each time you open the tab or return to the app.
The search box looks in product names, waybill no, company, TIN, plate, driver, address and date at once. Filters: RS.ge status, seller and BuildOS status (new / awaiting approval / in stock / rejected).
Stock-in approval
A waybill is not received into stock directly from the list. This also applies to closed waybills; the decision is made after accounting has checked.
- 1Open the waybill and click 'Send for stock-in approval'.
- 2In the 'Stock-in approval' tab see the goods.
- 3Choose the warehouse: the one best matching the delivery address is suggested, you can change it.
- 4'Approve and receive into stock', or write a reason and 'Reject'. A rejected waybill can be sent again.
Internal waybill
For moving goods between sites open 'New internal waybill' under Outgoing. Choosing from / to warehouses fills the addresses automatically; goods are picked from the source warehouse's stock. For road transport the driver ID and plate are required; no price is needed.
- 1Fill in the form and click 'Save as draft on RS.ge'.
- 2Check the draft in the list.
- 3If correct, 'Activate' (you are asked to confirm); if not, 'Delete draft'.
New-waybill alerts
Connected companies are checked every 15 minutes. New waybills are grouped into one notification (sellers, total amount) and pushed only to users who can see the Procurement module. The first check marks existing waybills as seen and sends no alert.
Related module pages
Sign in with the demo account to try it
In the demo company every screen in this guide is filled with sample data; it is reset every night.
[email protected] · Demo12345!
Subcontractor account: [email protected] · Demo12345!
Independent subcontractor account (two employers): [email protected] · Demo12345!