Quality, meetings and RFIs

ITP inspection templates, hold points, meeting minutes, submittals and RFIs.

Quality inspection (ITP)

An inspection is opened from a template (pre-pour concrete, plaster, tiling, electrical before closing… come ready-made). Each item is marked pass or fail. When the inspection is closed, failed items automatically drop into the Defect List.

  1. 1In the Quality tab click "Add default templates" or write your own; each line is one item.
  2. 2Put "!" at the start of a line to make it a hold point: the next activity cannot start until it passes, and a failure opens a high-severity defect.
  3. 3Open the inspection, choose the location, mark the items and close it.

Meeting minutes

Meeting notes and actions are written line by line: "Title | Owner | 2026-10-05". Each action drops into the Instruction Book in one click and is tracked from there.

Submittals

A file is submitted for material, sample or drawing approval: a description (brand, model, data sheet) and attachments. The developer approves, approves with notes or rejects; the decision and date stay on record.

Requests for information (RFI)

When design or specifications are unclear, a written question is opened: subject, question, priority and attachment. The developer answers and closes it. If the answer has a cost impact, a change order is opened separately.

Related module pages

Sign in with the demo account to try it

In the demo company every screen in this guide is filled with sample data; it is reset every night.